Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Three Lakes
Adding a room or a detached ADU in Three Lakes means building inside a deed-restricted community, not just building on a lot. We work in Three Lakes often enough to know how the HOA’s architectural review, the platted setbacks on these streets off SW 152nd Avenue and SW 137th Avenue, and Miami-Dade County permitting all have to line up before anything breaks ground. Our technicians have up to 9 years of experience scoping structural work, and we quote the whole sequence up front rather than discovering it mid-job.
Call (888) 334-0815. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Why Three Lakes Homeowners Call Westchester Construction Co for Home Additions & ADU
Three Lakes is a built-out master-planned community in unincorporated west Kendall (ZIP 33186), which changes what a good contractor looks like here. There’s no greenfield to build on. Nearly every project is an addition, a conversion, or a rebuild inside an HOA that dictates exterior materials, colors, and which contractor paperwork gets approved before the association will even review a plan.
That’s the part most homeowners underestimate. We build the HOA architectural-review submission and the platted-lot setback check into the front of every Three Lakes estimate, so the design you fall in love with is the one that actually clears review and county permitting. Our technicians have up to 9 years of experience with load-bearing structural work, not cosmetic remodeling, and we carry the same name-brand material access across all seven of our service categories – Driveways & Pavers, Fencing, Home Additions & ADUs, Bathroom Remodeling, Windows & Doors, Roofing, and Kitchen Remodeling – under one point of accountability.
One contractor, every trade. That matters on an addition where the finish schedule, the roof tie-in, and the driveway apron all land in the same scope of work.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Three Lakes
ADU Design & Permitting in Three Lakes
Every Three Lakes ADU or addition is really two approvals in sequence: the HOA’s architectural review first, then Miami-Dade County’s permit review. We build the design package to satisfy both, which means the exterior material and color schedule is settled alongside the structural drawings rather than after them. Skipping that order is the single most common way a Three Lakes project loses weeks to a redesign.

Garage Conversion ADU in Three Lakes
The attached garages on these 1980s and 1990s CBS block-and-stucco homes convert well, and they sidestep the rear-yard access problem that trips up detached ADUs. A garage conversion still needs a permit, a real egress plan, and a finished envelope that holds up against wind-driven summer rain. Kitchens and baths inside the conversion can be built out with Kohler or Moen fixtures and Cambria or Silestone surfaces without switching trades.

New Detached ADU in Three Lakes
A detached ADU is the most demanding project on this list because it’s ground-up construction on a platted lot. Setbacks recorded against the lot, the pool cage, mature landscaping, and a narrow single-car driveway all shape what’s buildable in the rear yard. Prefabricated options from Abodu, Cover, and Dvele can shorten the on-site build, and we’ll tell you honestly whether a stick-built or prefab approach fits your lot and your HOA.

Junior ADU & Interior Conversion in Three Lakes
Converting existing square footage – a lanai, an oversized utility room, or a portion of the house – is often the fastest path to an ADU in Three Lakes. These jobs still run through the same HOA and permitting sequence, but they avoid the grading and utility-extension costs of a detached build. Impact-rated windows and door openings are frequently part of the scope, and we carry PGT, CGI, and ECO Window Systems options that fit the HOA’s exterior-color approval.
When you’re ready to look at the full range of what we build, start with our home additions & ADU work.
Trusted Brands We Service in Three Lakes
We work with a curated catalog of name-brand materials across every trade, so you choose the brand and we handle the build. For ADU and addition work that means prefab systems from Abodu, Cover, and Dvele where a factory-built envelope fits, plus the same Cambria, Silestone, and Caesarstone surfaces, Kohler and Grohe fixtures, and PGT or CGI windows you’d spec into a whole-home renovation. We don’t claim parts stock or exclusivity – we claim access to real material choices and a single contractor coordinating them.
Common Home Additions & ADU Problems We See in Three Lakes Homes
- An ADU or addition designed and quoted before HOA architectural review and platted-lot setback checks. The homeowner commits to a layout, then the association sends it back and a redesign eats the schedule. We front-load the review so that can’t happen.
- A rear-yard ADU or shop sited without accounting for equipment and material access past the pool cage and narrow driveway. Haul and staging costs climb mid-project when a concrete truck can’t reach the pad. We scope access before we quote.
- Septic and well setbacks plus grading and drainage on the open lot skipped at scoping. The foundation and utility rough-in trigger a change order once county review begins. We check the setbacks and drainage plan first.
- Original single-pane windows and lanai screens that fail current impact and pressure-code standards. On these 1980s and 1990s homes, a remodel often becomes the moment to upgrade windows and shutters, which also has to clear the HOA’s exterior-color approval.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Three Lakes, FL
Here’s what a typical project in Three Lakes runs. These are estimated ranges – the written estimate sets the final price, and every quote is free with a line-item breakdown.
| Project | Typical Estimated Range in Three Lakes |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves the number: whether it’s ground-up or a conversion, the foundation and utility work, the equipment access to the site, the window and envelope upgrades, and the finish material tier you choose. On a Three Lakes lot the access and setback findings often shift cost more than the finish schedule does, which is exactly why we scope them before quoting. A garage conversion typically lands at the low end; a new detached ADU sits highest because it carries a full foundation, utilities, and a standalone envelope.
We Also Serve Cities Near Three Lakes
Three Lakes sits in the middle of west Kendall, and we work the surrounding communities regularly – The Crossings, Country Walk, The Hammocks, and Kendale Lakes. The HOA and lot rules differ town to town, so mention where you are when you call and we’ll tell you what the approval sequence looks like on your side.
Serving Three Lakes, FL – Our Local Coverage Area
We serve Three Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Three Lakes
Yes – in Three Lakes the HOA’s architectural review comes first, then the Miami-Dade County permit review. The association approves exterior materials, colors, and the contractor paperwork, and that approval has to be settled before the county application goes in cleanly. Call (888) 334-0815 to start your review package – estimates are free.
A detached ADU in Three Lakes typically runs $90,000 – $220,000 depending on size, foundation, utilities, and prefab versus stick-built. Garage conversions come in lower at an estimated $30,000 – $80,000. Call (888) 334-0815 for an exact quote – estimates are free and the written estimate sets the price.
Often yes, but it depends on the recorded lot-line and setback envelopes on your specific platted lot. Three Lakes is built out, so the pool cage, landscaping, and driveway width also limit buildable rear-yard space. We’ll check the setbacks and access before you commit to a layout – call (888) 334-0815.
Yes – any ADU or room addition in Three Lakes needs a permit, and the county reviews the structural work before it’s signed off. We pull permits and pass inspections as part of a single scope of work. Call (888) 334-0815 to talk through your project.
We scope the HOA review, platted setbacks, septic and well setbacks, equipment access, and grading and drainage before we quote, then write the allowances, draw schedule, and inspection milestones into one agreement. That front-loading catches the problems that otherwise become change orders. Call (888) 334-0815 for a written line-item estimate – free, and the written estimate sets the final price.
Get Your Free Three Lakes Estimate
Whether it’s a garage conversion, a junior ADU, or a full detached build, the first step in Three Lakes is a conversation about your lot, your HOA, and the setback envelopes before anything else. We’ll walk the site, check access, and hand you a written line-item estimate with the approval sequence mapped out. Call (888) 334-0815. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Westchester Construction Co.