Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Country Walk
Adding space to a Country Walk home means dealing with two review layers, not one. You need the county permit, and you need the community’s Architectural Review Committee to sign off on how the addition looks before framing can start. In a deed-restricted, master-planned community like Country Walk, that second layer is the step most addition projects get stuck on, because a design can meet Florida Building Code and still get rejected for a roofline or stucco shade the committee doesn’t like. We build the ARC submittal into the scope from day one, so your addition doesn’t sit half-finished waiting on a committee. Our technicians have up to 9 years of experience with structural work. Call (888) 334-0815 to schedule your free estimate.
Why Country Walk Homeowners Call Westchester Construction Co for Home Additions & ADU
We know Country Walk’s review culture because it shapes every addition here. Homes across the community were built mostly through the 1990s and 2000s as Mediterranean-style single-family houses with stucco-over-CBS walls, barrel-tile roofs, and paver driveways. That consistency is the point of the deed restrictions, and the committee protects it.
That means our first job on a Country Walk addition isn’t swinging a hammer. It’s matching your existing finish palette so the submittal clears review the first time. We pull the roof pitch, wall finish, and window style from your home, then build the elevation drawings and finish schedule around them. When a project touches multiple trades, we handle it as one coordinated build instead of leaving you to manage a framer, a roofer, and a window installer separately. You choose the brand; we handle the build, from the roof over your addition down to the finishes inside. Response to Country Walk is quick, and the estimate is always free.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Country Walk
Every addition in Country Walk starts the same way: figure out what the ARC will approve, then sequence the build to that timeline. Here’s how we handle the work most Country Walk homeowners ask about.
Second Story Additions
A second-story addition is where the deed restrictions bite hardest. The committee can reject a second-story design if its roofline doesn’t continue your home’s existing barrel-tile pitch and stucco color, even when the structure meets Florida Building Code on paper. We draw the addition to continue the original roofline rather than fight it, and we don’t begin framing or roof tie-ins until ARC sign-off is in hand, so load-bearing walls aren’t left exposed through South Florida’s rainy season.

Garage Conversion ADU
A garage conversion is the most affordable path to an ADU in Country Walk, typically running $30,000-$80,000. The mistake we see is treating it as a purely interior remodel. If you add a new window or exterior door, the style and finish can trigger the architectural review process even on an inside job, and skipping the ACC submittal invites a stop-work order when the elevation doesn’t match the deed-restricted standard. We submit the elevation change as part of the plan, not after the fact.

ADU Design & Permitting
Design and permitting carry more weight in Country Walk than in neighboring unincorporated tracts, because the community’s review runs alongside the county permit rather than instead of it. We build the ARC paperwork and the county submittal together so the two calendars don’t collide. Our home additions & ADU team handles the drawings, the finish schedule, and the submittal so you’re not the one chasing approvals.

New Detached ADU
A detached ADU gives you the most living space, at $90,000-$220,000 as a typical estimate, and it’s the project most likely to draw committee attention because it changes the look of the lot. Finish-palette matching matters most here. We match the new structure’s roof and stucco to your existing home so the detached unit reads as part of the property, not an afterthought.
Trusted Brands We Service in Country Walk
For homeowners who want a modern, prefab approach to an ADU, we work with systems from Abodu, Cover, and Dvele, giving you real product choices rather than a single take-it-or-leave-it option. Prefab doesn’t sidestep the review process, though. A prefab ADU still has to match your Country Walk home’s finish palette to clear the committee. We carry no parts inventory and stock nothing locally; what we bring is access to name-brand materials and the ability to specify and coordinate them across one build. That keeps turnaround predictable and quality consistent from the roof down to the interior finishes.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Country Walk Homes
Country Walk’s deed restrictions and its 1990s-2000s housing stock create a few recurring problems. These come up again and again.
- Finish package submitted without a coordinating sample. Homeowners often pull their stucco color from a faded 1990s paint chip or an old HOA palette, but the committee typically wants a sample matched to the original barrel-tile roof and wall finish before it will approve. Without that sample, the submittal comes back and the calendar restarts.
- Framing started before ARC sign-off. Beginning a second-story build before approval leaves load-bearing walls and roof tie-ins exposed through rainy season, and delays compound. The fix is to lock the finish package and the draw schedule to the approval timeline, not the other way around.
- Garage conversion treated as interior-only. Adding a window or door changes the elevation, and skipping the ACC submittal on that change can bring a stop-work order once the new opening doesn’t match the deed-restricted elevation.
- Roof and stucco weathering from South Florida’s sun and humidity. Intense sun and year-round humidity accelerate tile degradation and stucco cracking on Country Walk’s barrel-tile and stucco homes. That matters for an addition, because the new work has to blend with finishes that have already aged.
Pricing for Home Additions & ADU in Country Walk, FL
Here’s what additions and ADUs typically run in Country Walk. These are estimates, and the written estimate sets the final price.
| Project | Typical Estimated Range |
|---|---|
| Home Addition | $45,000-$130,000 |
| ADU Construction | $90,000-$220,000 |
| Garage Conversion | $30,000-$80,000 |
What moves the number is structural scope, how much finish-palette matching the committee requires, and whether the build calls for a coordinated package of trades like roofing and windows alongside the addition itself. In Country Walk, the review timeline also shapes scheduling, since we won’t start framing ahead of approval. You get a line-item written estimate before anything starts, and the price you sign is the price you pay. Call (888) 334-0815 for a free estimate.
We Also Serve Cities Near Country Walk
Homeowners just outside Country Walk call us too. We take on additions and ADUs in The Hammocks, The Crossings, Three Lakes, and Kendall West, where the same structural capability applies even when the deed restrictions differ. If you’re weighing a second story, a garage conversion, or a detached unit anywhere in that area, our home additions & ADU team can walk you through what your property allows.
Serving Country Walk, FL – Our Local Coverage Area
We serve Country Walk and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Country Walk
The ARC typically wants elevation drawings, a finish schedule, and physical samples that match your home’s existing barrel-tile roof and stucco color. Because Country Walk’s housing was built to a narrow Mediterranean palette in the 1990s and 2000s, the committee is checking that your addition continues that palette rather than introducing a new one. We assemble the elevation drawings and finish schedule for you. Call (888) 334-0815 for a free estimate and we’ll map out what your project needs.
Expect review to add several weeks to the calendar, and if a submittal is rejected over a missing finish sample, the restart alone can cost 4-6 weeks. That’s why we build the approval step into the schedule from the start rather than treating it as a formality after design. Call (888) 334-0815 to schedule your free estimate and get the timeline straight.
Only if nothing on the exterior changes, and that’s hard to guarantee on a livable conversion. A new window or door alters the elevation, and the deed-restricted standard can trigger an ACC submittal even on an interior job. Skipping it risks a stop-work order. We confirm what your conversion requires before work starts. Call (888) 334-0815 to schedule your free estimate.
We file it. We handle the ARC submittal and the county permit together, so the two review calendars line up instead of colliding. That includes the elevation drawings and finish schedule the committee reviews. You don’t chase approvals. Call (888) 334-0815 to schedule your free estimate.
Matching your existing roof pitch and stucco finish matters most, along with planning for intense sun and year-round humidity that wear on barrel tile and stucco. Because the new work must blend with finishes that have already aged in that climate, the detail work on the exterior is where an addition succeeds or fails review. Call (888) 334-0815 for a free estimate and we’ll walk the details with you.
Adding space to a Country Walk home is a structural project with a review layer on top, and the two have to move together. Whether you’re planning a second story, a garage conversion, or a fully detached ADU, we handle the design, the ARC submittal, the permit, and the coordinated build as one job with one point of accountability. You choose the brands; we handle the build. Call (888) 334-0815 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Westchester Construction Co.